WhatsApp Side Button
Subscribe Now WhatsApp

Join WhatsApp

Join Now

CM Solar Tubewell Subsidy Details February 2026 – Complete Farmer Guide

Published On: February 6, 2026
Follow Us
CM Solar Tubewell Subsidy Details February 2026 – Complete Farmer Guide

Farmers can cut diesel and electricity costs by switching to solar irrigation under the CM Solar Tubewell Subsidy February 2026 program. The scheme supports agricultural landowners in installing solar-powered water pumps with partial government funding. Instead of paying heavy fuel bills, growers get long-term savings, stable water supply, and eco-friendly farming. The initiative, backed by the Government of Punjab, focuses on boosting crop production while reducing load on the power grid. If you have agricultural land and an existing tubewell connection, this subsidy can significantly lower installation expenses. Below is the step-by-step guide, eligibility rules, and required documents to help you apply without delays.

CM Solar Tubewell Subsidy Details February 2026 – Complete Farmer Guide

What Is CM Solar Tubewell Subsidy 2026?

A government-funded program helping farmers convert electric or diesel tubewells into solar-powered systems at reduced cost.

Key Benefits

  • Lower irrigation cost

  • No fuel dependency

  • Long system lifespan (20+ years)

  • Better water access for crops

Eligibility Criteria

  • Punjab-based farmer

  • Valid land ownership proof

  • Existing tubewell or irrigation need

  • CNIC & mobile number registered

Required Documents

Document Purpose
CNIC Copy Identity verification
Land Ownership Papers Proof of farming land
Electricity Bill / Tubewell Record Existing system proof
Passport Photos Application record

How to Apply (Step-by-Step)

1. Registration

Apply through agriculture department channels.

2. Verification

Officials inspect land and tubewell site.

3. Approval

Subsidy approval issued after document check.

4. Installation

Solar company installs system under guidelines.

Why This Scheme Matters

Solar irrigation reduces farming expenses and supports sustainable agriculture across Punjab.

Conclusion

Switching to solar is a long-term financial win. Eligible farmers should apply early, complete documents, and track their application status through official channels.

FAQs

What is the subsidy percentage?

Government covers a major portion; farmer pays remaining share.

Who can apply?

Punjab farmers with agricultural land.

Is diesel tubewell conversion allowed?

Yes, conversion to solar is supported.

How long is approval time?

Usually a few weeks after verification.

Can small farmers apply?

Yes, small landowners are eligible.

Is maintenance included?

Basic warranty comes from installation company.

Hamza Ali

Hamza Ali is an experienced writer contributing to the cdldta.pk platform. With a strong background in government projects and infrastructure development, his work focuses on bringing attention to the impact of public sector initiatives.